Sky Base Engineers & Contractors

Essar Oil Limited — Vadinar

Project 04Scaffolding

A ₹210 lakh scaffolding erection and dismantling project for Essar Oil Limited at Vadinar, including material.

Location
Vadinar, Gujarat
Category
Scaffolding
Project Value
₹210.00 Lakhs
Client
Essar Oil Limited
Work Order
300002803
Work
Scaffolding Erection & Dismantling with Material

Sky Base completed a ₹210 lakh scaffolding erection and dismantling project for Essar Oil Limited at Vadinar.

The documented scope included both erection and dismantling of scaffolding with material, making this one of the company's largest completed assignments.

Project Description

The project required Sky Base to provide the scaffolding systems and supporting material necessary for industrial site operations.

The work covered the complete cycle of scaffolding deployment—from erection and preparation for use through controlled dismantling.

Industrial scaffolding requires careful coordination because temporary structures must provide safe and practical access while meeting the requirements of the work being performed.

Sky Base's documented procedures cover the inspection of scaffolding tubes, couplers, boards, bracing, ladders, platforms, and access points before and during use.

Scope of Work

  • Scaffolding erection
  • Scaffolding dismantling
  • Supply of scaffolding material
  • Site manpower and supervision
  • Scaffold inspection
  • Controlled handover and dismantling

Safety & Quality

Sky Base's safety policy states that safety is treated as a priority throughout field operations.

Its scaffolding procedures include:

  • PPE requirements
  • Supervision
  • Toolbox talks
  • Inspection
  • Tagging
  • Fit-for-use certification
  • Compliance with client safety instructions

Project Significance

The ₹210 lakh Essar Oil project adds significant industrial-scale experience to Sky Base's portfolio, particularly in the Vadinar industrial environment, where the company has completed multiple documented scaffolding assignments.